Kitchen Remodel Planning: Compare Scope, Not Just Cabinets

Set a kitchen renovation scope by resolving layout, cabinet specifications, mechanical work, finish selections, and bid assumptions.

Published Updated Independent homeowner guidance

Kitchen proposals can differ greatly because “remodel” may mean new finishes in the existing layout or a coordinated rebuild with moved utilities and structural changes. Current local prices are unavailable here. Establish one written scope and compare bids that identify the same products, work areas, and exclusions.

Set the layout and appliance plan

Mark which walls, openings, sink, range, refrigerator, and dishwasher will stay or move. Changes to plumbing, gas, electrical service, ventilation, or structural framing may require separate trades, permits, or design decisions. Ask bidders to flag what they have assumed about each.

Confirm appliance dimensions and connection needs before cabinets are ordered. A proposal should say who supplies and installs appliances, reconnects them, and coordinates any required electrical or ventilation changes.

Make product specifications concrete

“New cabinets” does not specify construction, finish, hardware, fillers, panels, interior fittings, or installation. Record the cabinet line or a sufficiently detailed specification, countertop material and edge, backsplash extent, sink, faucet, and flooring. List selections that remain open and the allowance assigned to each.

Ask whether demolition includes removal of old cabinets, counters, flooring, and backsplash, and whether disposal is included. Clarify substrate repair and leveling assumptions, plus how damage uncovered during demolition will be evaluated and approved.

  • Keep a selection schedule with model numbers and finish references.
  • Identify owner-supplied items and their delivery deadlines.

Plan sequencing, access, and comparable bids

The schedule should show major stages such as demolition, rough-in, inspections, cabinet installation, countertops, finishes, and final connections. Ask what access remains during construction, how dust is contained, and whether a temporary kitchen arrangement is needed.

Request written bids using the same drawings and selection schedule. Compare labor, materials, permits, protection, cleanup, exclusions, payment milestones, and change-order procedure. Current local pricing must come from qualified local bidders, not a generic online estimate.